How much work area needed for cashew nut line?
Usually what we say for work area needed is for machine itself occupy area, not include
raw material storage area, finished output area, office, toilet, cateen, parking space workers' domitory and so on.
if you want to calculate the whole factory area, you should consider the above beside machine occupy area.
200-300kg/h: about 200-300m2
500-600kg/h: about 500-600m2
1000kg/h: about 800-1000m2
2000-2500kg/h: about 1500M2
5000kg/h: about 3000m2
the machine layout have "I'shape, L shape and U shape, we can design according to your factory width and length.
in all, for the factory size, the bigger, the better.